Subject |
Content |
|
---|---|---|
Daily |
Before working |
Check anything could be disturb for working. |
Check any locking or loosen parts at belt. |
||
Check all valve and fittings. |
||
Check blower is working correctly. |
||
Check the activation of squeegee and scraper. |
||
Check any defect on surface of scraper. |
||
After working |
Check all switch is OFF. |
|
Check main switch is OFF. |
||
Clean up all ink on screen frame, and other parts. |
||
Cover the vacuum plate for protecting harmful material. |
||
Weekly |
Check all cylinders. |
|
Check all solenoid valves. |
||
Check all sensors. |
||
Check all pipe lines. |
||
Check all defect on lines. |
||
Check all defect on air lines. |
||
Check all fixations of each part. |
||
Monthly |
Grease status must be checked in every 3 month term. Grease product should be for “MULTI PURPOSE”. And every movable rail or steel rod and shaft for machine moving, must be checked. |
|
Remove water in regulator. |